国家卫生计生委发布我国第五次儿童体格发育调查结果。调查显示,我国儿童体格发育水平超过世界卫生组织颁布的儿童生长标准。()
The growth of the use of English as the world’s primary language for international communication has obviously been continuing for several decades. (46) But even as the number of English speakers expands further there are signs that the global predominance of the language may fade within the foreseeable future.
Complex international, economic, technological and cultural changes could start to diminish the leading position of English as the language of the world market, and UK interests which enjoy advantage from the breadth of English usage would consequently face new pressures. Those realistic possibilities are highlighted in the study presented by David Graddol. (47) His analysis should therefore end any self-contentedness among those who may believe that the global position of English is so stable that the young generations of the United Kingdom do not need additional language capabilities.
David Graddol concludes that monoglot English graduates face a bleak economic future as qualified multilingual youngsters from other countries are proving to have a competitive advantage over their British counterparts in global companies and organizations. Alongside that, (48) many countries are introducing English into the primary-school curriculum but British schoolchildren and students do not appear to be gaining greater encouragement to achieve fluency in other languages.
If left to themselves, such trends will diminish the relative strength of the English language in international education markets as the demand for educational resources in languages, such as Spanish, Arabic or Mandarin grows and international business process outsourcing in other languages such as Japanese, French and German, spreads.
(49) The changes identified by David Graddol all present clear and major challenges to the UK’s providers of English language teaching to people of other countries and to broader education business sectors. The English language teaching sector directly earns nearly £1.3 billion for the UK in invisible exports and our other education related exports earn up to £10 billion a year more. As the international education market expands, the recent slowdown in the numbers of international students studying in the main English-speaking countries is likely to continue, especially if there are no effective strategic policies to prevent such slippage.
The anticipation of possible shifts in demand provided by this study is significant: (50) It gives a basis for all organizations which seek to promote the learning and use of English, a basis for planning to meet the possibilities of what could be a very different operating environment. That is a necessary and practical approach. In this as in much else, those who wish to influence the future must prepare for it.
【背景资料】梁玉市政项目部承建一项新建城镇道路工程,指令工期100d。开工前,项目经理召开动员会,对项目部全体成员进行工程交底,参会人员包括“十大员”,即:施工员、测量员、A、B、资料员、预算员、材料员、试验员、机械员、标准员。
道路工程施工在雨水管道主管铺设、检查井砌筑完成、沟槽回填土的压实度合格后进行。项目部将道路车行道施工分成四个施工段和三个主要施工过程(包括路基挖填、路面基层、路面面层),每个施工段、施工过程的作业天数如表1-1。工程部按流水作业计划编制的横道图如表1-2,并组织施工,路面基层采用二灰混合料,常温下养护7d。
在路面基层施工完成后,必须进行的工序还有C、D,然后才能进行路面面层施工。
表1-1 施工段、施工过程及作业天数计划表(未包含养护时间)

表1-2 新建城镇道路施工进度计划横道图
项目部分段组织道路沥青底面层施工,主路改性沥青面层采用多台摊铺机呈梯队式,全幅摊铺,压路机按试验确定的数量、组合方式和速度进行碾压,以保证路面成型平整度和压实度。
【背景资料】
某大(2)型泵站工程施工招标文件根据《水利水电工程标准施工招标文件》(2009年版)编制。专用合同条款规定:钢筋由发包人供应,投标人按到工地价3800元/吨计算预算价格,税前扣除;管理所房屋列为暂估价项目,金额600万元。某投标人编制的投标文件部分内容如下:
1.已标价工程量清单中,钢筋制作与安装单价分析如表4所示:
钢筋制作与安装单价分析表单位:1t
| 编号 | 名称及规格 | 单位 | 数量 | 单价(元) | 合计(元) | 备注 |
| 1 | 直接费 | 4724.53 | ||||
| 1.1 | 基本直接费 | 4354.41 | ||||
| 1.1.1 | 人工费 | 120.70 | ||||
| (1) | 甲 | 工时 | 2.32 | 6.91 | 16.03 | |
| (2) | 高级工 | 工时 | 6.48 | 6.43 | 41.67 | |
| (3) | 中级工 | 工时 | 8.1 | 5.47 | 44.31 | |
| (4) | 乙 | 工时 | 6.25 | 2.99 | 18.69 | |
| 1.2 | 材料费 | 元 | 4165.70 | |||
| (1) | 钢筋 | t | 1.05 | 3858.2 | 4051.11 | |
| (2) | 钢丝 | Kg | 4 | 5.7 | 22.80 | |
| (3) | 丙 | Kg | 7.22 | 7 | 50.24 | |
| (4) | 其他材料费 | 41.25 | 1 | 41.25 | ||
| 1.1.3 | 机械使用费 | 60.01 | ||||
| 1.2 | 其他直接费 | 370.12 | ||||
| 2 | 间接费 | 188.98 | ||||
| 3 | 企业利润 | 196.54 | ||||
| 4 | 扣除钢筋材料价 | 3990.00 | ||||
| 5 | 税金 | 36.07 | ||||
| 合同执行单价 | 1156.12 |
2.混凝土工程施工方案中,混凝土施工工艺流程见图4:

3.资格审查资料包括“近3年财务状况表”、“近5年完成的类似项目情况表”等相关表格及其证明材料复印件。
【背景资料】
某公司中标修建城市新建主干道,全长2.5km,双向四车道,其结构从下至上为:20cm 厚石灰稳定碎石底基层,38cm 厚水泥稳定碎石基层,8cm 厚粗粒式沥青混合料底面层,6cm厚中粒式沥青混合料中面层,4cm 厚细粒式沥青混合料表面层。
项目部编制的施工机械主要有:挖掘机、铲运机、压路机、洒水车、平地机和自卸汽车。施工方案中:石灰稳定碎石底基层直线段由中间向两边的方式进行碾压,沥青混合料摊铺时随时对温度随时检查,用轮胎压路机初压,碾压速度控制在1.5~2.0km/h。
施工现场设立了公示牌:内容包括工程概况牌、安全生产文明施工牌,安全纪律牌。项目部将20cm 厚石灰稳定碎石底基层,38cm 厚水泥稳定碎石基层,8cm 厚粗粒式沥青混合料底面层,6cm 厚中粒式沥青混合料中面层,4cm 厚细粒式沥青混合料表面层等五个施工过程分别用Ⅰ、Ⅱ、Ⅲ、Ⅳ、Ⅴ表示,并将Ⅰ、Ⅱ两项划分成4 个施工段①②③④。
Ⅰ、Ⅱ两项在各施工段上持续时间如表4-1 所示:

而Ⅲ,Ⅳ,Ⅴ不分施工段连续施工,持续时间均为一周。项目部按各施工段持续时间连续,均衡作业,不平行,搭接施工的原则安排了施工进度计划(表型如表4-2)

【背景资料】
某一级公路,路面面层采用C30水泥混凝土。该项目施工单位面层施工过程如下:
第一步,该施工单位按要求进行水泥混凝土配合比设计,采用实验室确定的“实验室配合比”直接配料;
第二步,施工单位按要求架设模板;
第三步,确定好最佳拌和时间,配备一座间歇式搅拌楼拌和;
第四步,对搅拌混凝土进行现场取样,做水泥混凝土抗压强度试验;
第五步,采用自卸车将新拌混凝土在规定的时间内合格地运到摊铺现场;
第六步,采用小型机具铺筑法进行摊铺和振捣施工;
第七步,整平饰面:振动、提浆、整平后用圆盘式抹面机往返2~3遍进行压实整平饰面;
第八步,按要求进行各类接缝的设置与施工;
第九步,按要求进行混凝土的养生;
第十步,养生期满后,采用软拉毛机械进行抗滑沟槽施工;
第十一步,清除混凝土板缝中夹杂的砂石、泥浆、尘土及其他污染物后进行灌缝施工及灌缝养生。
某施工单位承担了一矿井井底车场的施工,该井底车场为常见的环形车场,排水系统由两条独立的水仓构成,施工单位所编制的工程施工网络计划如下图所示。所有的施工工序时间都已不能再缩短。
在开工前组织了图纸会审,由设计单位主持,建设单位和施工单位参加,设计单位说明拟建工程的设计意图和设计技术说明;施工单位形成正式文件的图纸会审纪要,作为与设计文件同时使用的技术文件和指导施工的依据,同时作为建设单位与施工单位进行工程结算的依据。
工程施工中发生了以下事件:
事件一:巷道交岔点D施工时,由于开挖断面大,施工单位采取了短进尺、预支护、早封闭的技术措施,确保了工程质量和安全,但施工进度慢,延误工期10d。
事件二:主井绕道工程E施工中发现围岩的稳定性很差,与地质资料提供的条件不符,施工单位采取了加强支护的措施来保证工程质量,但延误工期20d,增加施工成本 20万元。
事件三:水仓入口工程G施工时,因施工单位安排失误,发生工程延误,延误工期20d,并影响了其后续工程内水仓M和外水仓N的正常施工。
某办公楼工程,建筑面积45000㎡,地下二层,地上二十六层,框架一剪力墙结构,设计基础底标高为-9.0m,由主楼和附属用房组成。基坑支护采用复合土钉墙,地质资料显示,该开挖区域为粉质粘土且局部有滞水层。施工过程中发生了下列事件:
事件四:在砌体子分部工程验收时,监理工程师发现有个别部位存在墙体裂缝。监理工程师对不影响结构安全的裂缝砌体进行了验收,对可能影响结构安全的裂缝砌体提出整改要求。
【背景资料】
某施工单位承接了某二级公路E3标段(K15+000~K25+000)路基工程施工。由于该标段工程量集中,工期紧张,项目部对工程质量管理与控制尤其重视,要求项目总工对质量控制负总责,对技术文件、报告、报表进行全面深入审核与分析,并采取测量、试验、分析、监督等各种方法对现场质量进行检查控制。该标段作为一个单位工程,划分了分部、分项工程,依据质量检验评定标准对分项工程进行评分,项目部按优、良、合格、不合格四个等级来评定工程质量。
项目部还根据不同管理层次和职能对采用新技术、新材料、新工艺的各环节设置了质量控制关键点,以便进行重点监控。
项目部在抓质量的同时,也注重安全生产。在K23+200~K24+100路段拟采用大型综合爆破进行石方路基施工。项目部编制了爆破设计书,并提交监理工程师审批后,成立了现场指挥机构并组织人员实施,在危险边界设置了明显标志,撤离了警戒区内人员、牲畜,并在警戒区四周安排警戒人员,最后成功完成了大型综合爆破。石方路基施工完成后,项目部实测了压实度、纵断高程、中线偏位、宽度、横坡、边坡平顺度,各项指标均满足相应标准和要求。
问题:
住所在 A 市甲区的个体工商户黄某,为改善其在 A 市乙区商业大厦内承租的店铺的经营环境,向户籍在 A 市丙区的朋友周某借款 200 万元,约定借款期限 1 年。期限届满,因黄某经营不善,无力清偿周某的借款,周某向黄某催讨未果,决定向法院申请支付令。
根据案情回答下列问题:
法院受理周某的支付令申请,并向黄某发出支付令。关于本案的表述,下列选项正确的是?( )
支付令应由独任审判员制作发出
法院向黄某送达支付令时,黄某拒收,法院可以留置送达支付令
法院向黄某送达支付令时,黄某拒收,法院不得留置送达支付令
法院受理支付令申请后,对债权债务关系明确、合法的,应当自受理之日起 10 日内向黄某发出支付令