【背景资料】A公司承建中水管道工程,全长870m,管径DN600mm。管道出厂自南向北垂直下穿快速路后,沿道路北侧绿地向西排入内湖,管道覆土3.0m~3.2m,管材为碳素钢管,防腐层在工厂内施作施工图设计建议:长38m下穿快速路的管段采用机械顶管法施工混凝土套管;其余管段全部采用开槽法施工。施工区域土质较好,开挖土方可用于沟槽回填,施工时可不考虑地下水影响。依据合同约定,A司将顶管施工分包给B专业公司。开槽段施工从西向东采用流水作业。
施工过程发生如下事件:
事件一,质量员发现个别管段沟槽胸腔回填存在采用推土机从沟槽一侧推土入槽不当施工现象,立责令施工队停工整改。
事件二,由于发现顶管施工范围内有不明管线,B公司项目部征得A公司项目负责人同意,拟改用人工顶管方法施工混凝土套管。
事件三,质量安全监督部门例行检查时,发现顶管坑内电缆破磨损较多,存在严重安全隐患,对A公司和建设单位进行通报批评;A公司对B公司处以罚款。
事件四,受局部拆迁影响,开槽施工段出现进度滞后局面,项目部拟采用调整工作关系的方法控制施工进度。
【背景资料】
某施工单位承包了东风水库工程施工,制定的施工方案中部分内容如下:
1.水库大坝施工采用全段围堰法导流。相关工作内容有:①截流;②围堰填筑;③围堰拆除;④导流隧洞开挖;⑤下闸蓄水;⑥基坑排水;⑦坝体填筑。
2.岸坡石方开挖采用钻孔爆破法施工,爆破开挖布置如下图所示
施工过程中发生如下事件:
事件1:某天装药作业时因现场阴暗,爆破作业班长亲自拉线接电安装照明设施,照明灯置于距爆破作业面10m处。作业中发生安全事故,造成3人死亡、2人重伤。事故发生后,项目法人及时进行了报告。
事件2:随着汛期临近,围堰上游水位上涨,基坑靠近堰脚处发生险情,地面出现涌水,夹带有许多泥砂,并有逐渐加剧的趋势。
In his autobiography, Darwin himself speaks of his intellectual powers with extraordinary modesty. He points out that he always experienced much difficulty in expressing himself clearly and concisely, but (46)he believes that this very difficulty may have had the compensating advantage of forcing him to think long and intently about every sentence, and thus enabling him to detect errors in reasoning and in his own observations. He disclaimed the possession of any great quickness of apprehension or wit, such as distinguished Huxley. (47)He asserted, also, that his power to follow a long and purely abstract train of thought was very limited, for which reason he felt certain that he never could have succeeded with mathematics. His memory, too, he described as extensive, but hazy. So poor in one sense was it that he never could remember for more than a few days a single date or a line of poetry. (48)On the other hand, he did not accept as well founded the charge made by some of his critics that, while he was a good observer, he had no power of reasoning. This, he thought, could not be true, because the “Origin of Species” is one long argument from the beginning to the end, and has convinced many able men. No one, he submits, could have written it without possessing some power of reasoning. He was willing to assert that “I have a fair share of invention, and of common sense or judgment, such as every fairly successful lawyer or doctor must have, but not, I believe, in any higher degree.” (49)He adds humbly that perhaps he was “superior to the common run of men in noticing things which easily escape attention, and in observing them carefully.”
Writing in the last year of his life, he expressed the opinion that in two or three respects his mind had changed during the preceding twenty or thirty years. Up to the age of thirty or beyond it poetry of many kinds gave him great pleasure. Formerly, too, pictures had given him considerable, and music very great, delight. In 1881, however, he said: “Now for many years I cannot endure to read a line of poetry. I have also almost lost my taste for pictures or music.” (50)Darwin was convinced that the loss of these tastes was not only a loss of happiness, but might possibly be injurious to the intellect, and more probably to the moral character.
甲公司提供施工服务,属于在某一时段内履行的履约义务,为取得施工合同发生的合同取得成本按照履约进度进行摊销。2021年7月至12月,发生的有关经济业务如下:
(1)7月31日,通过竞标取得一项为期2年的施工合同,合同总价款为1000万元,施工费每半年支付250万元。为取得该合同,2021年7月甲公司以银行存款支付投标费2万元、投标人员差旅费1万元、销售人员佣金6万元,预期这些支出未来均能收回。
(2)截至2021年12月31日,为该项合同累计发生施工成本120万元,预计还将发生施工成本480万元。甲公司按照实际发生的成本占预计总成本的比例确定履约进度。
(3)2021年12月31日,甲公司按照合同约定收到施工费250万元。
要求:
根据上述资料,不考虑相关税费等其他因素,分析回答下列小题。
5.根据期初资料、资料(1)至(3),上述业务对甲公司2021年“营业利润”的影响金额为( )万元。
【背景资料】
某混凝土分部工程共有50个单元工程,单元工程质量全部经监理单位复核认可。50个单元工程质量全部合格,其中优良单元工程38个;主要单元工程以及重要隐蔽单元工程共20个,优良19个。施工过程中检验水泥共10批、钢筋共20批、砂共15批、石子共15批,质量均合格。混凝土试件:C25共19组、C20共10组、C10共5组,质量全部合格。施工中未发生过质量事故。
背景资料:
承包人承担某堤防工程,工程项目的内容为堤段Ⅰ(土石结构)和堤段Ⅱ(混凝土结构),合同双方依据《堤防和疏浚工程施工合同范本》签订了合同。签约合同价为600万元,合同工期为120天。合同约定:(1)工程预付款为签约合同价的10%;当工程进度款累计达到签约合同价的60%时,从当月开始,在2个月内平均扣回。(2)工程进度款按月支付,承包人缴纳的履约保证金兼具工程质量保证金功能,施工进度付款中不再扣留质量保证金。经监理机构批准的施工进度计划如下图。

由于发包人未及时提供施工图纸,导致“堤段Ⅱ混凝土浇筑”推迟5天完成,增加费用5万元。承包人在事件发生后向发包人提交了延长工期5天,补偿费用5万元的索赔申请报告。
根据“堤段Ⅰ堤身填筑”工程量统计表绘制的工程进度曲线如下。


某施工单位承接了一市内管道工程,包括甲乙丙三个中继段,施工单位根据工程实际情况结合施工队施工情况,对各个工序安排4施工队伍施工,光缆全部敷设完毕后进行光缆接续,本工程计划4月1日开工,施工内容如下:

施工过程中发生如下事件:子管推迟到开工后第5天到货;光缆推迟到开工后第14天到货;穿放乙段子管,管道不通需要修复,停工5天。