【不定项选择题】

【背景材料】
2001年4月26日,某桥梁施工现场发生一起脚手架坍塌事故,造成7人死亡、1人重伤的重大事故,直接经济损失80万元。
事故经过如下:4月26日8时40分,8名工人在脚手架平台面上东北角拆卸成捆杠杆时,产生动荷,东北角一侧脚手架弯曲变形产生坍塌,8人坠落,其中7人死亡,1人重伤。
经分析,事故原因如下:经调查认定,这是一起违章指挥、违章作业造成人员伤亡的重大责任事故,造成该事故的原因是:
1)直接原因
(1)违章指挥吊装作业。某施工单位为了赶进度,在脚手架存在严重安全问题的情况下,违章指挥吊装作业,将约为40t的杆件集中堆放在约30m2的平台上,造成脚手架因局部负荷超载失稳而坍塌。
(2)脚手架存在严重缺陷。某脚手架安装公司搭设的脚手架没有施工设计图纸,未按规定搭设,严重违反了国家强制性标准和有关规程的规定。该脚手架没有剪刀撑,没有与周围的建筑物可靠拉接,存在严重安全隐患,在尚未完工验收的情况下就开始启用。
2)间接原因
监理公司未能严格遵守监理规范。某监理公司未能严格遵守监理规范的要求,未对某施工单位提供的施工组织设计认真审查研究;未按监理规范的规定,对脚手架搭设施工进行旁站、巡视、平行监理;在脚手架存在严重安全隐患并且未验收的情况下,对两次违章使用未予制止,致使最后一次使用发生了事故,没有尽到监理单位应尽的职责,是造成这起事故的重要原因。

【不定项选择题】

市场风险与信用风险相比,具有数据充分和易于计量的特点。(  )

A.
B.
【不定项选择题】

【背景资料】
某建筑公司(乙方)于某年4月20日与某厂(甲方)签订了修建建筑面积为3000m2工业厂房(带地下室)的施工合同,乙方编制的施工方案和进度计划已获监理工程师批准。该工程的基坑开挖土方量为4500m3,假设土方开挖清单综合单价为4.2元/m3,措施费、税金等综合费率为清单综合单价的20%。该工程的基坑施工方案规定:土方工程采用租赁一台斗容量为1m3的反铲挖土机施工(租赁费450元/台班)。甲、乙双方合同约定5月11日开工,5月20日完工。在实际施工中发生如下事件:
事件一:因租赁的挖土机大修,晚开工2d,造成人员窝工10个工日;
事件二:基坑开挖后,因遇软土层,接到监理工程师5月l5日停工的指令,进行地质复查,配合用工15个工日;
事件三:5月19日接到监理工程师于5月20日复工的命令.同时提出基坑开挖深度加深2m的设计变更通知单,由此增加土方开挖量900m;
事件四:5月20日~5月22日,因下罕见的大雨迫使基坑开挖暂停,造成人员窝工10个工日;
事件五:5月23日用30个工日修复冲坏的永久道路,5月24日恢复挖掘工作,最终基坑于5月30日挖坑完毕。

【不定项选择题】

【背景资料】
某水电站工程主要工程内容包括:碾压混凝土坝、电站厂房、 溢洪道等,工程规模为中型。水电站装机容量为 50MW,碾压混凝土坝坝顶高程 417m,最大坝高 65m。该工程施工平面布置示意图如图5-1所示。


图 5-1 施工平面布置示意图
事件一: 根据合同工期要求,该工程施工导流部分节点工期目标及有关洪水标准如表 5-1 所示。
表 5-1 施工导流部分节点工期目标及有关洪水标准表

事件二:上游围堰采用均质土围堰,围堰断面示意图如图 5-2 所示,施工单位分别采取瑞典圆弧法(K1) 和简化毕肖普法(K2)计算围堰边坡稳定安全系数, K1、K2 计算结果分别为 1.03 和 1.08。施工单位组织编制了围堰工程专项施工方案,专项施工方案内容包括工程概况等。


事件三:碾压混凝土坝施工中,采取了仓面保持湿润等养护措施。 2016 年 9 月,现场对已施工完成的碾压混凝土坝体钻孔取芯,钻孔取芯检验项目及评价内容如表5-2 所示。

表 5-2 钻孔取芯检验项目及评价内容


事件四:为保证蓄水验收工作的顺利进行, 2017 年 9 月,施工单位根据工程进度安排,向当地水行政主管部门报送工程蓄水验收申请,并抄送项目审批部门。

【不定项选择题】

Music means different things to different people and sometimes even different things to the same person at different moments of his life. It might be poetic, philosophical, sensual, or mathematical, but in any case it must, in my view, have something to do with the soul of the human being. Hence it is metaphysical; but the means of expression is purely and exclusively physical: sound. I believe it is precisely this permanent coexistence of metaphysical message through physical means that is the strength of music. (46) It is also the reason why when we try to describe music with words, all we can do is articulate our reactions to it, and not grasp music itself.

Beethoven’s importance in music has been principally defined by the revolutionary nature of his compositions. He freed music from hitherto prevailing conventions of harmony and structure. Sometimes I feel in his late works a will to break all signs of continuity. The music is abrupt and seemingly disconnected, as in the last piano sonata. In musical expression, he did not feel restrained by the weight of convention. (47) By all accounts he was a freethinking person, and a courageous one, and I find courage an essential quality for the understanding, let alone the performance, of his works.

This courageous attitude in fact becomes a requirement for the performers of Beethoven’s music. His compositions demand the performer to show courage, for example in the use of dynamics. (48) Beethoven’s habit of increasing the volume with an extreme intensity and then abruptly following it with a sudden soft passage was only rarely used by composers before him.

Beethoven was a deeply political man in the broadest sense of the word. He was not interested in daily politics, but concerned with questions of moral behavior and the larger questions of right    and wrong affecting the entire society. (49) Especially significant was his view of freedom, which, for him, was associated with the rights and responsibilities of the individual: he advocated freedom of thought and of personal expression.

Beethoven’s music tends to move from chaos to order as if order were an imperative of human existence. For him, order does not result from  forgetting or ignoring the disorders that plague our  existence; order is a necessary development, an  improvement that may  lead to the Greek ideal of spiritual elevation. It is not by chance that the Funeral March is not the last movement of the Eroica Symphony, but the second, so that suffering does not have the last word. (50) One could interpret much of the work of Beethoven by saying that suffering is inevitable, but the courage to fight it renders life worth living.

【不定项选择题】

篇目为十二篇的封建成文法典包括(        )。

A.

 《北齐律》

B.

 《开皇律》

C.

 《大明律》

D.

 《大清律例》

【不定项选择题】

【背景资料】某公司建一项城市桥梁工程,设计为双幅分离式四车道,下部结构为墩柱式桥墩,上部结构为简支梁。该桥盖梁采取支架法施工,项目部编制了盖梁支架模板搭设安装专项方案。包括如下内容:采用盘扣式钢管满堂支架;仅对支架强度进行计算,考虑了模板荷载,支架自重和盖梁钢筋混凝土的自重;核定地基承载力不符合施工要求;对支架搭设范围的地面进行平整预压后立即搭设支架。盖梁模板支架搭设示意如图。

事件一:架子工未完成全部斜撑搭设被工长查出要求补齐。现场支架模板安装完成后,迫于工期压力,项目部立即开始混凝土浇筑,被监理叫停下达了暂停施工通知,并提出整改要求。
事件二:监理工程师提出,为了增强支架的稳定性。在支架的左侧右侧,应分别增加两根斜撑。斜撑的起点节点可能为a\b\c;终止节点可能为图中1\2\3\4\5。
事件三:支架施工完毕,施工单位编制了拆除方案,上报监理审批。监理提出,应补充支架拆除的安全措施。

【不定项选择题】

【背景资料】

某施工单位承接了一座桥梁施工任务,桥梁上部结构采用先张法预制梁板。项目部在施工场布置了临时预制场。并采用“自行式吊机架设法”架设预制梁。施工中的主要材料由施工单位自行采购。在预制和架设中,有如下事件发生:

事件1:进场钢筋必须进行分批验收,分别堆存,不得混杂,且应设立识别标志。钢筋在运输过程中,应避免锈蚀和污染。钢筋宜堆置在仓库(棚)内,露天堆置时,应垫高并加遮盖

事件2:钢筋应按现行国家标准和试验方法的规定,或经监理人批准采用国际上的相应标准,对桥涵所用的钢筋应抽取试样做力学性能试验。试验室由施工单位自己选定。

事件3:在施工中,由于钢筋购买的问题,需要进行部分重要结构中的主钢筋进行代换,项目部总工进行验算后,决定按照代换的钢筋提交购买计划。同时,对于增加的费用,拟向业主提出价格调整的申请。

事件4:预应力筋的下料长度应通过计算确定,计算时应考虑了结构的孔道长度或台座长度、锚夹具厚度、千斤顶长度等因素

问题:

【不定项选择题】

某施工单程承接了一DWDM设备安装工程,包括3个OTM设备安装测试、8个OA设备安装测试。项目部编制了施工组织设计,包括工程概况、编制依据、成本计划等内容。成本预算计划如下表所示。

注:各项工作均速施工
施工过程中发生如下2个事件:
事件一:OTM设备安装工作施工到第7天时,业主要求对未安装设备进行位置变更,停工2天,损失10000元
事件二:OA设备安装工作第1天进场,业主通知设备推迟到货1天,导致停工1天,损失3000元
工程进行到第13天,项目部对前12天完成情况统计如下表

系统测试阶段,施工单位从信号分析仪、光谱仪、传输分析仪中选择仪表按照下列连接示意图采用环回法对系统误码进行测试:

【不定项选择题】

案例(二)
某机电工程安装公司(以下简称A公司)总承包了某石化装置安装工程的施工任务。装置施工的主要内容包括:单重30~80t的机电设备共28台;工艺管道4500m,介质有油、气等;全厂电气装置、自动化仪表安装调试工程、给水排水工程、防腐绝热工程施工。 A公司将工程的给水排水工程、防腐绝热工程分包给具有专业承包资质的B公司。由于工程正值夏季施工,天气炎热,且工期十分紧迫,建设单位认为安全施工形势较严峻,要求做好安全工作。开工前,A公司项目经理部组织各部门及各分包单位制定了安全生产责任书。施工过程中,由于建设单位订货的几台大型工艺设备晚到,延误了设备防腐绝热施工的工期,致使B公司经济损失约1 0万元。B公司向建设单位提出工期和费用索赔。工程试运行阶段,建设单位要求A公司组织进行联动试车工作,并签订了补充合同。A公司为之编制了单机试车和联动试车方案。