【不定项选择题】

Since the days of Aristotle, a search for universal principles has characterized the scientific enterprise. In some ways, this quest for commonalities defines science. Newtons laws of motion and Darwinian evolution each bind a host of different phenomena into a single explicatory framework.

(46)In physics, one approach takes this impulse for unification to its extreme, and seeks a theory of everything--a single generative equation for all we see. It is becoming less clear, however, that such a theory would be a simplification, given the dimensions and universes that it might entail, nonetheless, unification of sorts remains a major goal.

This tendency in the natural sciences has long been evident in the social sciences too. (47)Here, Darwinism seems to offer justification for it all humans share common origins it seems reasonable to suppose that cultural diversity could also be traced to more constrained beginnings. Just as the bewildering variety of human courtship rituals might all be considered forms of sexual selection, perhaps the worlds languages, music, social and religious customs and even history are governed by universal features. (48)To filter out what is unique from what is shared might enable us to understand how complex cultural behavior arose and what guides it in evolutionary or cognitive terms.

That, at least, is the hope. But a comparative study of linguistic traits published online today supplies a reality check. Russell Gray at the University of Auckland and his colleagues consider the evolution of grammars in the light of two previous attempts to find universality in language.

The most famous of these efforts was initiated by Noam Chomsky, who suggested that humans are born with an innate language—acquisition capacity that dictates a universal grammar. A few generative rules are then sufficient to unfold the entire fundamental structure of a language, which is why children can learn it so quickly.

(49)The second, by Joshua Greenberg, takes a more empirical approach to universality identifying traits (particularly in word order) shared by many language which are considered to represent biases that result from cognitive constraints.

Gray and his colleagues have put them to the test by examining four family trees that between them represent more than 2,000 languages.(50)Chomskys grammar should show patterns of language change that are independent of the family tree or the pathway tracked through it. Whereas Greenbergian universality predicts strong co-dependencies between particular types of word-order relations. Neither of these patterns is borne out by the analysis, suggesting that the structures of the languages are lire age-specific and not governed by universals

应得客app下载
手机使用
微信扫一扫
二维码扫一扫
分享
微信内点击右上角“…”即可分享
反馈
收藏
举报
参考答案
参考解析
【不定项选择题】

【背景资料】
某市区新建道路上跨一条运输繁忙的运营铁路,需设置一处分离式立交,铁路与新建道路交角θ=44°,该立交左右幅错孔布设,两幅间设 50cm 缝隙。桥梁标准宽度为 36.5m,左右幅桥梁全长均为 120m(60m+60m),如图 2-1 所示,左右幅孔跨布置均为两跨一联预应力混凝土单箱双室箱梁,箱梁采用满堂支架现浇施工的方法。梁体浇筑完成后,整体 T 型结构转体归位如图 2-2 所示。邻近铁路埋有现状地下电缆管线,埋深 50cm,施工中将有大型混凝土送运车、钢筋运输车辆通过。


工程中标后,施工单位立即进驻现场。因工期紧张,施工单位总部向其所属项目部下达立即开工指令, 要求项目部根据现场具体情况,施工一切可以施工的部位,确保桥梁转体这一窗口节点的实现。
本工程施工组织设计中,施工单位提出如下建议:“因两幅桥梁结构相同,建议只对其中一幅桥梁支架进行预压,取得详细数据后,可以作为另一幅桥梁支架施工的指导依据”。经驻地监理工程师审阅同意后,上报总监理工程师审批,施工组织设计被批准。 

【不定项选择题】

【背景资料】某施工单位承建城中村改造工程,建筑面积65000平方米钢筋混凝土结构。工程计价采用工程量清单计价模式,与建设单位按照《建设施工合同(示范文本)》GF-2017-0201签约了施工总成合同。

双方约定,工程预付款为10%,除钢材、水泥、铜材按实际调整外,其他一律不予调整。施工单位签约合同的价的有关费用如下:分部分项工程费22000.00万元;暂列金额4000.00万元;总包管理费1000.00万元措施费以建筑面积为基数,按照200元每平米记取;规费费率为2%;增值税费率9%。经分析测算包括人工费在内的工程直接成本为19900.00万元。施工单位按照合同约定进场后,及时开展了各项准备工作,按合同约定工程预付款付款之日向建设单位提交工程预付款申请。工程预付款约定支付期满七天内,建设单位仍未支付,施工单位向建设单位发出停工通知书,并采用了停工措施,在停工七天后向建设单位提交了索赔申请报告。施工过程中因砌块市场供应紧张,不能满足工程进度需要,施工单位向监理单位提交了采用ALC隔墙板替代砌块的合理化建设说明,监理单位核实确认之后,上报建设单位。


【不定项选择题】
关于业务(2),下列分录表述正确的有(  )。
A.
借:固定资产30700 <br />      应交税费一应交增值税(进项税额)5100 <br />      贷:银行存款35800
B.
借:固定资产30000 <br />      应交税费一应交增值税(进项税额)5100 <br />      贷:银行存款35100
C.
2012年计提折旧分录为: <br /> 借:制造费用1750 <br />     贷:累计折旧1750
D.
2012年计提折旧分录为: 借:管理费用1750     贷:累计折旧1750
【不定项选择题】

Suppose you are working for the “Aiding Rural Primary School” project of your university. Write an email to answer the inquiry from an international student volunteer, specifying the details of the project.

You should write about 100 words on the ANSWER SHEET.

Do not use your own name in the email. Use “Li Ming” instead. (10 points)


【不定项选择题】

华北地区某省会机场进场停机坪扩建,采用水泥混凝土面层。计划工期为三月底开工,当年竣工验收。采用工程量清单的招标方式进行招投标工作。建设单位委托有资质的造价咨询机构编制了工程量招标清单。

该工程拟采用民航工程总承包管理模式,选择必须具备场道一级资质的总承包施工单位,其中扩建停机坪部位的泛光照明等目视助航设置可以选择分包企业进行施工。

施工单位在施工前明确了场道相关工作的逻辑关系,制定了施工进度计划,绘制了网络计划图。

网络图逻辑关系及施工周期如下表所示:

【不定项选择题】

【背景资料】
某施工单位承接了某隧道施工任务,该隧道为分离式双洞隧道,洞口间距50m。其中左线长3996m,进口里程桩号为ZK13 +956;右线长4013m,进口里程桩号为YK13+952。根据地质勘察报告,YK14+020 ~YK16 +200段分布有冲刷煤屑、瓦斯包体和含水瓦斯包体,岩层节理及裂隙发育。其中,YK14 +850 ~YK14+900段穿越背斜组成的复式褶皱带,为挤压强烈、地应力相对集中地段。开工当年10月5日,该隧道右洞采用全断面开挖至YK14 +872处,二衬距掌子面68m。10月6日,监理单位发现YK14 +859 ~YK866段初期支护变形超限,立即书面通知施工单位停止掘进。10月13日,施工单位根据设计变更的要求对变形超限段进行了处理。10月20曰, YK14 +859 ~YK14 +863段发生塌方,至10月23日,塌方段在拱顶部位形成高2 ~ 3m,宽2~3m,长3~4m的塌腔。施工单位立即会同监理、设计和业主单位对塌方段进行了现场确认及变更立项,由设计单位出具了变更设计图。为防止类似的塌方車故,施工单位进一步加强了对未塌方段的塌方预测。10月27日8时。在未对瓦斯浓度进行检测的情况下,34名工人进人洞内开展塌方段及未塌方段的处理作业,作业采用的台车上配备了普通配电箱和普通电源插座。10时起,由于风机出现故障,洞内停止通风。11时20分左右,右洞发生瓦斯爆炸,34名工人全部罹难。

【不定项选择题】

某施工单位中标北方城市某高档商务楼项目,施工内容:建筑给水排水、建筑电气、通风与空调和智能建筑工程;A单位与建设单位签订了机电供应与安装的专业承包合同,采用固定总价合同,签约合同价7800万元(含暂列金额300万元)工程的主要设备由业主指定品牌,施工单位组织采购,工程结算款的3%作为质量保修金。
商务楼空调采用风机盘管加新风系统,空调水为二管制系统;风管采用半硬质的岩棉管壳保温,保温壳与管道的外径相匹配,管壳采用金属丝捆扎;网络服务机房采用开放式网格桥架,机房制冷散热系统设置进口的恒温恒湿空调机组。商务楼机电工程完工时间正好是冬天,供暖系统平稳可靠运行
工程完工后,施工单位组织竣工预验收,在检查验收中发现以下几个问题:
(1)空调系统的风机盘管安装如图1所示。
(2)商务楼工程未进行带冷源的系统联合调试。
(3)风管保温壳的接缝方向一致,用于捆扎的金属丝间距为400mm,且每节捆扎1道。
(4)竣工资料中的进口恒温恒湿机组说明书没有中文标识
工程竣工结算时,经审核预付款已全部抵扣完成,暂列金额未使用,设计变更增加费用90万元。

图1 风机盘管机组安装示意图

【不定项选择题】

【案例二】

   某市新建道路跨线桥,主桥长520m,桥宽22.  15m,桥梁中间三跨为钢筋混凝土预应力连续梁,跨径组合为30m+35m+30m,需现场浇筑,做预应力张拉,其余部分为T形22m简支梁。部分基础采用沉人桩,平面尺寸5m×26m,布置128根桩的群桩形式,中间三跨模板支架有详细专项方案设计,并经项目法人批准将基础桩施工分包给专业公司,并签订了分包合同。施工日志有以下记录:

   (1)施工组织设计经项目经理批准签字后,上报监理工程师审批。

   (2)为增加桩与土体的摩擦力,沉桩顺序定为从四周向中心打。为了防止桩顶或桩身出现裂缝、破碎,决定以贯人度为主进行控制。

   (3)专项方案提供了支架的强度验算,符合规定要求。

   (4)由于拆迁影响了工期,项目总工程师对施工组织设计作了变更,并及时请示项目经理,经批准后付诸实施。

   (5)为加快桥梁应力张拉的施工进度,从其他工地借来几台千斤顶与项目部现有的油泵配套使用。


【不定项选择题】

【背景资料】

某道路工程属城市次干路,长3800m,路宽16.5m,位于城市环路以内,设计结构为:30cm厚9%石灰土处理土基,12%石灰土底基层,35cm厚水泥稳定碎石基层,12cm厚沥青混凝土面层。施工项目部编制施工组织设计后,做了一些必要的技术准备工作,经技术交底后开始道路施工。受城市交通管制和环境保护要求,水泥稳定碎石基层拌合站设在郊区,采用夜间运输、白天摊铺方式,碾压成型后发现水泥稳定碎石基层局部表面松散。由于拆迁延期,有一段沥青混凝土路面延至十二月上旬摊铺,项目部选择白天气温较高,约在5~8℃时段,采取提高沥青混凝土出厂温度到180℃,运输中覆盖保温等措施,摊铺碾压沥青混凝土成型。沥青混凝土面层竣工后,施工单位进行了外观检查,沥青表面平整,没有脱落、推挤等现象,经过检测弯沉值、平整度、中线高程、横坡等项目,合格率达到98%,施工单位认为工程质量检验合格。项目部在工程施工全部完成后,依据施工进度计划和施工进度计划调整资料编制了进度控制总结,并上报公司工程管理部。

【不定项选择题】

关某可以享受的医疗期为(    )个月。

A.

1

B.

3

C.

6

D.

9