【不定项选择题】

《小学教师专业标准(试行)》提出小学教师专业标准的基本理念是师德为先、学生为本、能力为重、终身学习。()

A.
B.
应得客app下载
手机使用
微信扫一扫
二维码扫一扫
分享
微信内点击右上角“…”即可分享
反馈
收藏
举报
参考答案
参考解析
【不定项选择题】

甲公司的下列支出中,在计算年度企业所得税应纳税所得额时,不得扣除的是(    )。

A.

直接向某小学捐赠1万元

B.

合理的劳动保护费支出2万元

C.

向金融企业借款利息支出3万元

D.

支付违约金1.7万元

【不定项选择题】

A公司中标某供水厂的扩建工程,主要内容为一座在建调蓄水池。水池长 65m,宽32m。为现浇钢筋混凝土结构,筏板式基础。新建水池采用明挖基坑施工。A 公司施工项目部编制了施工组织设计,其中含现浇混凝土水池施工方案和基坑施工方案。水池施工方案中有如下内容:采用穿墙螺栓来平衡混凝土浇筑对模板侧压力,应选用两端可拆卸的螺栓。固定模板用螺栓的防水构造示意图如下:

施工中发生以下事件:

事件一:池壁和顶板连续施工,为增强整体性,项目部拟将顶板支架斜杆与池壁模板杆件相连接;池壁模板安装时,内外模均采用一次安装到顶的施工方法,没有考虑模板间杂物清扫措施。施工缝处的橡胶止水带采用叠接,在止水带上穿孔固定就位。

事件二:施工正值雨期,基坑内地下水位急剧上升,为避免出现水池漂移,施工单位拟采取如下措施:(1)准备了应急供电用的发电机和多台水泵。(2)可能情况下引入地下水和地表水,使池内外无水位差。

事件三:项目进展顺利,竣工前有关部门进行施工技术文件预验收时,发现项目部人员正在补填许多施工过程文件,且施工技术文件不完全。


【不定项选择题】

【背景资料】
某客专设计时速为250km/h,由某局承建的III标段,主要施工内容包括路基、桥梁、隧道、轨道,铺轨由业主统一组织。K112+200-K113+200 路基长1km,该段路基设计为软土路堤工程,填土高度为5-20m,台后过渡段填筑高度5m,取土场穿越一处集镇可以直接运至施工现场。路基基底设计采用塑料排水板、排水砂垫层、浆体搅拌桩等方式对进行加固,塑料排水板处理深度为10m。路基本体采用普通填料,路基基床底层采用改良细粒土填料,基床表层采用级配碎石。施工过程中发生了以下事件:
事件一,施工前刚好该集团的另一子公司正在相邻标段进行路基填筑,为了节约成本、缩短工期,现场技术主管立即电话联系,要来路桥工艺性试验内容的相关参数,随即安排路基的填筑工作;
事件二,监理单位要求项目部针对现场实际施工编制关键工序的作业卡片和安全预防措施方案,上报监理单位;
事件三,现场监理程师在对现场进行检查时,发现正在填筑的路基坡脚出现隆起,立即上报了现场的,经过现场察看监理组长立即停止现场的填筑施工,安排施工单位做好警示标志,防止路基垮塌;通过检查发现路堤中心沉降为12mm/d,边桩的水平位移7mm/d;塑料排水板长度仅为7m。通过对内业资料发现无过程中自检资料,最终的质检资料却显示合格;
事件四:路堤与桥台过渡段填筑时,桥台基坑先采用改良细粒土填筑后,再进行过渡段的填筑。过渡段路堤与桥台锥体和相邻路堤同步填筑,用大型压路机压实;
事件五:项目部编制的关键工序作业卡片明确基床底层按照“四区段、六流程”填筑施工,填料分层的压实厚度按照35cm进行控制。

【不定项选择题】

The time for sharpening pencils, arranging your desk, and doing almost anything else instead of writing has ended. The first draft will appear on the page only if you stop avoiding the inevitable and sit, stand up, or lie down to write. (41)_________

Be flexible. Your outline should smoothly conduct you from one point to the next, but do not permit it to railroad you. If a relevant and important idea occurs to you now, work it into the draft. (42)_________ Grammar, punctuation, and spelling can wait until you revise. Concentrate on what you are saying. Good writing most often occurs when you are in hot pursuit of an idea rather than in a nervous search for errors.

(43)_________ Your pages will be easier to keep track of that way, and, if you have to clip a paragraph to place it elsewhere, you will not lose any writing on the other side.

If you are working on a word processor, you can take advantage of its capacity to make additions and deletions as well as move entire paragraphs by making just a few simple keyboard commands. Some software programs can also check spelling and certain grammatical elements in your writing. (44)_________ These printouts are also easier to read than the screen when you work on revisions.

Once you have a first draft on paper, you can delete material that is unrelated to your thesis and add material necessary to illustrate your points and make your paper convincing. The student who wrote “The A & P as a State of Mind” wisely dropped a paragraph that questioned whether Sammy displays chauvinistic attitudes toward women. (45)_________

Remember that your initial draft is only that. You should go through the paper many times – and then again – working to substantiate and clarify your ideas. You may even end up with several entire versions of the paper. Rewrite. The sentences within each paragraph should be related to a single topic. Transitions should connect one paragraph to the next so that there are no abrupt or confusing shifts. Awkward or wordy phrasing or unclear sentences and paragraphs should be mercilessly poked and prodded into shape.

[A] To make revising easier, leave wide margins and extra space between lines so that you can easily add words, sentences, and corrections. Write on only one side of the paper.

[B] After you have clearly and adequately developed the body of your paper, pay particular attention to the introductory and concluding paragraphs. It’s probably best to write the introduction last, after you know precisely what you are introducing. Concluding paragraphs demand equal attention because they leave the reader with a final impression.

[C] It’s worth remembering, however, that though a clean copy fresh off a printer may look terrific, it will read only as well as the thinking and writing that have gone into it. Many writers prudently store their data on disks and print their pages each time they finish a draft to avoid losing any material because of power failures or other problems.

[D] It makes no difference how you write, just so you do. Now that you have developed a topic into a tentative thesis, you can assemble your notes and begin to flesh out whatever outline you have made.

[E] Although this is an interesting issue, it has nothing to do with the thesis, which explains how the setting influences Sammy’s decision to quit his job. Instead of including that paragraph, she added one that described Lengel’s crabbed response to the girls so that she could lead up to the A & P “policy” he enforces.

[F] In the final paragraph about the significance of the setting in “A & P,” the student brings together the reasons Sammy quit his job by referring to his refusal to accept Lengel’s store policies.

[G] By using the first draft as a means of thinking about what you want to say, you will very likely discover more than your notes originally suggested. Plenty of good writers don’t use outlines at all but discover ordering principles as they write. Do not attempt to compose a perfectly correct draft the first time around.

【不定项选择题】

【背景资料】某矿井主斜井设计断面为直墙半圆拱形,净宽5.0m、净高4.0m,倾角8°,斜长426m。表土段设计采用现浇钢筋混凝土支护;基岩风化带设计采用U29钢棚+金属网+混凝土联合支护,钢棚间距600mm;基岩段设计采用锚网喷支护,锚杆为Φ20×2000mm的螺纹钢树脂锚杆,间排距为800mm×800mm,喷射混凝土厚度150mm、混凝土强度等级为C20。
施工单位编制的主斜井施工方案如下:表土段采用明槽开挖法施工;基岩风化带采用暗挖法施工,选用履带行走掘进机掘进,架棚紧跟工作面,每掘进6m浇筑一次混凝土井壁;基岩段采用普通钻眼爆破法、正台阶施工方案,爆破及安全检查后初喷混凝土50mm,锚杆安装后进行复喷成巷。
施工过程中,发生如下事件:
事件1:主斜井86m~124m基岩风化带,为了快速通过渗水影响地段,施工单位未经监理单位同意,将钢棚垂直底板进行架设,钢棚间拉杆从7根调整为2根。掘进到108m时,工作面后15架钢棚倒塌,引发冒顶事故,造成工作面2人当场死亡、7人重伤、2人轻伤,其中1名重伤人员送至医院第8天医治无效死亡,直接经济损失230万元。事故调查发现,当班部分矸石没有清理干净,支架底座坐落在浮矸上,浮矸受积水和掘进机反复碾压后泥化。
事件2:该斜井施工到斜长260m处时,发现围岩比较坚硬,为加快施工速度,施工单位采用“少打眼、多装药”的全断面一次起爆方法进行掘进,敲帮问顶后直接安装锚杆,最后一次性喷射混凝土成巷。工序验收时,施工班组以每三个作业循环作为一个检查点进行检查。

【不定项选择题】

甲企业为增值税一般纳税人,适用的增值税税率为 13%,商品销售价格均不含增值税。确认收入的同时,结转其销售成本。2021 年 7 月,该企业发生的经济业务如下:

(1)1 日,与乙企业签订合同约定,向其销售 A、B 两种商品,合同价格为 800 万元,增值税税额为 104 万元,实际成本为 600 万元。商品已发出,收到客户开具的商业承兑汇票结清全部款项。甲公司 A 商品的单独售价为 400 万元,B 商品的单独售价为 600 万元。

(2)5 日,与丙企业签订一份商品销售合同,为取得该合同而发生的成本包括:因投标而发生的投标费 2万元,差旅费 3 万元,销售佣金 5 万元,上述款项已通过银行存款支付。

(3)10 日,甲企业按照与丙企业签订的合同发出该批商品,增值税专用发票注明的价款为 1000 万元,增值税额为 130 万元,实际成本为 800 万元,为客户代垫运输费 5 万元(不考虑增值税),全部款项已办妥托收手续。

(4)20 日,向丁公司销售一批商品,开具的增值税专用发票上注明的价款为 200 万元,增值税税额为 26万元,商品已发出。销售合同中约定现金折扣条件为 2/10,1/20,N/30,计算现金折扣时不考虑增值税。该批商品实际成本为 120 万元。甲企业基于对客户的了解,预计客户 10 天内付款的概率为 75%,20 天内付款的概率为 20%,30 天内付款的概率为 5%,甲公司认为按照最可能发生金额能够更好地预测其有权获取的对价金额。甲企业在 28 日收到货款。要求:根据上述材料,不考虑其他因素,分析回答下列问题。(答案中的金额单位用万元表示)

1. 根据资料(1),下列各项中,甲企业向乙企业销售商品会计处理表述正确的是( )。

A.
确认 A 商品主营业务收入 320 万元
B.
确认 B 商品主营业务收入 480 万元
C.
结转主营业务成本 600 万元
D.
确认应收账款 904 元
【不定项选择题】

某DWDM传输设备安装工程由甲、乙、丙、丁四个站组成,其中甲站、丁站为终端站,乙站、丙站为光放站。本工程新建一套公务系统、一套网管系统,施工单位承包方式为包工不包料。项目经理对工程进行工作分解后,根据工程量列出了工作的持续时间,所需主要资源以及工作的工艺关系如下表所示:

本工程的资源配置为:最多能投入6人、各种仪表1套,工程计划工期42天。据此,项目经理经安排后绘出了双代号网络图如下:

施工单位的资源成本如下表(其它成本不计):

本工程在实施过程中发生了如下事件:
事件一:由于设计单位疏忽,工程中发现甲站走线位置与机房实际情况不符,修改设计造成甲站安装增加了4人·天的工作量;
事件二:丁站本机测试时发现一块光波长转换器机盘的发光功率不合格,需要厂家更换,停工5天;
事件三:在整理竣工资料期间,由于施工人员参加职称考试,造成工期延误2天。

【不定项选择题】

【背景资料】某施工单位承接了一条二级公路的隧道施工项目,该隧道主要穿越砂层泥岩和砂岩,岩层节理、裂隙发育,富含裂隙水。隧道全长800m,设计净高5m,净宽12m,为单洞双向行驶的两车道隧道。
施工单位针对该项日编制了专项施工方案,其中包括工程概况、编制依据、劳动力计划等内容。拟采取二台阶开挖方法施工,施工顺序如图3所示,并按①-⑨的顺序作业。针对该隧道施工过程中有可能出现突水安全事故的特点,编制了应急预案。

【不定项选择题】

【背景资料】
某新建高速铁路站前工程第二标段线路平面布置如图5所示。

主要工程情况如下:
路基土石方共6 0万m3如图5中D1是在营业线旁的帮宽路堤。该段营业线路堤填料为透水性材料。
双线桥梁两座,均为旱桥,墩高8 --l0m,桥址处地形平缓、地质良好,上部结构均为跨径32m简支箱梁。箱梁由本标段自行负责施工;设计要求箱梁采用预制架设或支架现浇, 具体施工方案由施工单位自行选择并按建设管理有关规定办理审批手续。
单洞双线隧道两座,均无不良地质,其中2#隧道围岩为Ⅲ级、Ⅳ级和V级,三种围岩的长度各占三分之一,Ⅳ级和V级围岩在进口和出口段均衡分布。隧道均采用钻爆法施工,洞渣弃运至图示弃渣场。由于工期紧张,需要对2#隧道增加斜井,图5中拟定的斜井A和斜井B处均具备斜井设置的条件,只需选择其中一个斜井进行施工;两个拟定的斜井长度均为300m,纵坡均为5%,洞口地势均较为平缓;斜井A围岩为Ⅲ级,斜井B围岩为V级。
全线铺设CRTS工型双块式无砟轨道。施工单位制定的轨道工程施工方案为:(1)无砟轨道在全线正式施工前,进行首件工程施工,首件工程由监理单位选定o(2)浇筑的道床板混凝土终凝后,及时松开螺杆词整器、扣件,释放钢轨温度应力。具体松开螺杆调整器和扣件的时机需要根据施工环境温度提前试验确定(3)铺设区间无缝线路时,工地钢轨焊接方优先采用铝热焊。
根据合同约定,施工单位要按设计要求,在站前工程施工中为“四电”专业提供必要的接口条件。
本标段总工期为3 6个月,其中隧道工期为2 4个月。本工程为总价承包合同。

【不定项选择题】

根据资料(1)至(3),下列各项中,3月末甲公司实收资本和权益份额表述正确的是(  )。

A.
丁公司的权益份额为20%
B.
甲公司的实收资本总额为1 000万元
C.
丙公司的权益份额为32%
D.
乙公司的权益份额为48%