案例五

【背景资料】

某工程项目建筑面积6200㎡,地上12层,地下2层,采用框架  剪力墙结构体系。施工单位编制了单位工程施工组织设计,在施工平面图设计中依次考虑了如下几项工作:(1)布置现场内的运输道路,因场地条件限制采用主干道和消防车道合一单向行驶,道路宽度为3.2m;(2)确定起重机的位置,本工程采用一台有轨式塔吊,为方便运输,将塔吊安放在临现场大门一侧;(3)确定仓库及加工场的位置;(4)布置水电管线,其中沿距拟建房屋30m远的主干道路边每隔150m布置一个消火栓;(5)布置临时房屋,并在项目经理部办公室的墙面上悬挂了“五牌”和“二图”;(6)技术经济指标分析。

当该工程进行到第8层拆除钢模板时,将拆下的18根钢管(每根长4m)和扣件运到井字架的吊盘上,5名工人随吊盘一起从8层高处下落。此时,该机器的操作人员因事未归,一名刚刚招来两天的合同工亓动了卷扬机,卷扬机下降过程中,钢丝绳突然折断,人随吊盘下落坠地,造成2人死亡,3人重伤。

【问题】

应得客app下载
手机使用
微信扫一扫
二维码扫一扫
分享
微信内点击右上角“…”即可分享
反馈
收藏
举报
参考答案
参考解析
【不定项选择题】

根据资料 (4),甲企业核销坏账的账务处理正确的是 (    )。

A.

 借:信用减值损失 10

贷:应收账款 10

B.

 借:信用减值损失 10

贷:坏账准备 10

C.

 借:坏账准备 10

贷:应收账款 10

D.

 借:坏账准备 10

贷:信用减值损失 10

【不定项选择题】

某采石场企业进行花岗岩露天开采作业。该采石场的可采储量为133184万m³,每年开采规模为5万m³,采用露天方式进行开采,开采顺序为自上而下进行。凿岩采用风动式YT-18凿岩机,钻孔孔径为Φ32-40mm,孔深为3 ~4m,采用浅孔爆破方式进行爆破。采高达到6m时,进行分阶段开采。从上部开拓下一工作面,逐步形成多台阶的开场方式。矿石采用反铲挖掘机配自卸汽车进行开采。
2018年5月19日晚8时左右,矿山发生泥石流事故,淹没采石场的工棚。工棚建在一个山谷的小沟旁,上面的山坡很陡峭。工棚有一个小坡作为掩护,小的山洪、泥石流被小坡阻挡,直接流入小沟中。但是此次的泥石流来势凶猛,小沟被填满后,泥石流仍向前移动,直接把工棚给吞没了。整个事故过程历时很短,造成多人未及时逃生。事故发生后,该企业迅速启动应急救援预案,成立救援队伍,将伤员送医救治,并按规定及时进行了报告。该泥石流事故造成8名工人死亡。事故结束后当地人民政府按规定进行事故调查。
经过事故调查,发现引起事故的原因如下:
(1)该采石场地质较软弱,产状不稳定。上部由松散堆积物覆盖。
(2)泥石流发生前采石场遭遇暴雨,暴雨冲刷岩体上部地表。
(3)矿山企业未设置监测小组进行边坡监测,未能针对泥石流事故进行有效预防。
(4)采石场雨水无排泄通道,造成雨水积存。
该事故处理后,采石场为防止类似安全事故发生,针对采石场地质灾害及其他安全隐患编制了处置方案,并严格按照处置方案执行。
根据以上场景,回答下列问题(共22分):

【不定项选择题】

普遍取消数量限制中的“数量限制”是指(   )。

A.

对进口的数量限制

B.

对出口的数量限制

C.

禁止进出口

【不定项选择题】

清代州县无权自理的案件是(        )。

A.

田土案

B.

户婚案

C.

斗殴案

D.

盗窃案

【不定项选择题】

北京证券交易所(以下简称“北交所”)是经国务院批准设立的我国第一家公司制证券交易所,于2021年9月3日注册成立,聚焦打造服务创新型中小企业主阵地。

【不定项选择题】

[A] In December of 1869, Congress appointed a commission to select a site and prepare plans and cost estimates for a new State Department Building. The commission was also to consider possible arrangements for the War and Navy Departments. To the horror of some who expected a Greek Revival twin of the Treasury Building to be erected on the other side of  the White House, the elaborate French Second Empire style design by Alfred Mullett was selected, and construction of a building to house all three departments began in June of 1871.

[B] Completed in 1875, the State Departments south wing was the first to be occupied, with its elegant four-story library (completed in 1876), Diplomatic Reception Room, and Secretarys office decorated with carved wood, Oriental rugs, and stenciled wall patterns. The Navy Department moved into the east wing in 1879, where elaborate wall and ceiling stenciling and marquetry floors decorated the office of the Secretary.

[C] The State, War, and Navy Building, as it was originally known, housed the three Executive Branch Departments most intimately associated with formulating and conducting the nations foreign policy in the last quarter of the nineteenth century and the first quarter of the twentieth century--the period when the United States emerged as an international power. The building has housed some of the nations most significant diplomats and politicians and has been the scene of many historic events.

[D] Many of the most celebrated national figures have participated in historical events that have taken place within the EEOBs granite walls. Theodore and Franklin D. Roosevelt, William Howard Taft, Dwight D. Eisenhower, Lyndon B. Johnson, Gerald Ford, and George H. W. Bush all had offices in this building before becoming President. It has housed 16 Secretaries of the Navy, 21 Secretaries of War, and 24 Secretaries of State. Winston Churchill once walked its corridors and Japanese emissaries met here with Secretary of State Cordell Hull after the bombing of Pearl Harbor.

[E] The Eisenhower Executive Office Building (EEOB) commands a unique position in both the national history and the architectural heritage of the United States. Designed by Supervising Architect of the Treasury, Alfred B. Mullett, it was built from 1871 to 1888 to house the growing staffs of the State, War, and Navy Departments, and is considered one of the best examples of French Second Empire architecture in the country.

[F] Construction took 17 years as the building slowly rose wing by wing. When the EEOB was finished, it was the largest office building in Washington, with nearly 2 miles of black and white tiled corridors. Almost all of the interior detail is of cast iron or plaster; the use of wood was minimized to insure fire safety. Eight monumental curving staircases of granite with over 4,000 individually cast bronze balusters are capped by four skylight domes and two stained glass rotundas.

[G] The history of the EEOB began long before its foundations were laid. The first executive offices were constructed between 1799 and 1820. A series of fires (including those set by the British in 1814) and overcrowded conditions led to the construction of the existing Treasury Building. In 1866, the construction of the North Wing of the Treasury Building necessitated the demolition of the State Department building.

41.

C

42.

43.

F

44.

45.



【不定项选择题】

背景资料:沿海地区某单线铁路中的某一段,设计揭示为海相沉积的中~厚层软土。该段中有一座铁路中桥,设计为4跨16米简支T梁,钻孔桩基础,桩直径1.2米,桩长55米(摩擦桩),台后路基填土高度3.0米。设计要求对桥台及路基范围内的基底均采用袋装砂井处理,处理深度为12米。
  该桥按正常工期编制施工组织计划,采用常规方法进行钻孔桩、承台、墩(台)身施工,并如期完成。
  桥梁建成通车半年后,发现该桥出现桥台移位,梁缝压死。事后,在对施工期间的内业资料检查中,发现无软土路基的沉降观测记录,其他质检资料的记录结果显示施工质量均符合设计和规范要求。在现场实地调查中,发现桥梁施工质量合格,但软土地基处理深度仅为8米。

【不定项选择题】

甲大型地下铁矿,采用充填法开采,设计规模为500×104t/a。尾矿大部分用于充填井下采空区,部分排入尾矿库,尾矿库为三等库。矿山井下分东采区、中一采区、中二采区、西采区,每个采区有3~5个采矿中段,各生产水平通过斜坡道连通,四个采区共用-465m水平运输中段、主井提升、副井提升。该矿一期工程于2014年2月取得了安全生产许可证。
2020年3月甲矿一期工程达产。2022年该矿共产生尾砂220×104t,其中80×104t 排入尾矿库,同年度回采尾矿30×104t。2020年为办理安全生产许可证延期,尾矿库进行了安全评价,评价机构出具了评价报告。
2022年1月,甲矿启动二期延深工程建设,委托A矿业公司负责二期建设,主要负责开拓、采矿、提升运输、通风、供排水、供配电生产系统及其设备设施的运行管理。甲矿严格现场管理,严格落实外包工程安全生产主体责任,对A矿业公司实施统一管理,做到了“五统一”。
在二期延深工程建设过程中,发生了在甲矿和A矿业公司合同约定以外的隐患排查治理费用50万元、地下矿山通风费用20万元、支护费用30万元、防治水100万元、运输费用50万元。甲矿和A矿业公司互相认为应该由对方支付该费用。
2022年5月8日,当地县级人民政府应急管理部门现场督查发现该矿二期延深工程未批先建,遂下达执法文书,要求该矿立即停止二期延深工程建设,严格履行建设项目“三同时"程序,严格加强安全风险管控,完善了“安全避险“六大系统”。

【不定项选择题】

【背景资料】
某高速公路隧道右洞,起讫桩号为YK52+626~YK52+875。工程所在地常年多雨,地质情况为:粉质黏土、中强风化板岩为主,节理裂隙发育,围岩级别为Ⅴ级。该隧道YK52+626~YK52+740段原设计为暗洞,长114m,其余为明洞,长135m,明洞开挖采用的临时边坡坡率为1:0.3,开挖深度为12~15m。YK52+740~YK52+845明洞段左侧山坡高且较陡,为顺层边坡,岩层产状为N130°W∠45°。隧道顶地表附近有少量民房。隧道施工发生如下事件:事件1:隧道施工开工前,施工单位向监理单位提供了施工安全风险评估报告。在YK52+875~YK52+845段明洞开挖施工过程中,临时边坡发生了滑塌。经有关单位现场研究,决定将后续YK52+845~YK52+740段设计方案调整为盖挖法,YK52+785的盖挖法横断面设计示意图如图5所示,


盖挖法施工流程图如图6所示。事件2:在采用盖挖法施工前,监理单位要求再次提供隧道施工安全风险评估报告,施工单位以已提供过为由,予以拒绝。


事件3:施工单位对盖挖法方案相对于明挖法方案的部分施工费用进行了核算和对比,见表3。其中,挖石方费用增加了55.17万元,砂浆锚杆费用减少了42.53万元,φ42锁脚锚杆费用增加了25.11万元。


【不定项选择题】

【背景资料】某铁矿设计生产能力200万吨,采用地下开采方式,竖井、斜坡道联合开拓,空场采矿嗣后充填,2024年生产铁矿石300万t,开采深度范围为50m至-140m,水文地质条件为水文复杂矿井,矿岩中等稳固,矿体局部有极薄的绢云母软弱夹层。
该矿主、副井提升系统均选用落地式多绳摩擦提升机,主井采用14m³的箕斗提升矿石,副井采用单层罐笼提升人员、材料和掘进废石,副井内设有梯子间;斜坡道为井下无轨运输设备进出地表的通道,按单车道加错车道设计,其硐口标高为+110m;另设有东进风井和西回风井,且均设有梯子间。
该矿井下采掘施工全部外委给3个外来施工队伍。该矿地面工业场地设有办公楼、选矿厂(原矿处理能力为200x10^4t/a)、110kV变电站、尾砂充填站、空压机房、提升机房、锅炉房(8t/h燃煤蒸汽锅炉1台)等设施。部分地面工业设施处在矿体开采的影响范围内。选矿厂主要生产及辅助设备包括带式输送机、圆锥破碎机(中细碎)、双层圆振动筛、球磨机、磁选机等,另有不同起重量的行车多台。
该矿井下掘进工作面主要生产设备包括手持式凿岩设备、柴油铲运机、14t电机车、颚式破碎机(粗破)、柴油运矿卡车等。
该矿井下设有硐室型爆破器材库(可储存炸药10t、非电导爆管30000m和导爆雷管20000发)、中央变电所、水泵房、采区变电所、卸矿硐室、风机房、破碎硐室及井下调度室等硐室。
离矿3km处设有一座用黏土堆筑的四面筑坝的尾矿周转库,设计坝高8m,库容为120万m³,库区周边500m范围内有农田,但无民房。2024年生产尾矿45万吨,入库尾矿30万吨。
根据以上场景,回答下列问题(共26分):