某水利工程项目位于我国北部某省,枯水期流量很小,坝型为土石坝,设计采用黏土心墙防渗;坝址处河道狭窄,岸坡陡峻。
大坝采用碾压式填筑,坝体施工前,施工单位进行了碾压试验。施工中,坝体靠近混凝土涵管部位的土方填筑,需要采取技术措施以确保工程质量。
项目中某分部工程包括:坝基开挖、坝基防渗及坝体填筑,该分部工程验收结论为“本分部工程划分为80个单元工程,其中合格30个,优良50个,主要单元工程、重要隐蔽工程及关键部位的单元工程质量优良,且未发生过质量事故;中间产品全部合格,其中混凝土拌合物质量达到优良,故本分部工程优良。”
(41) Teri Byrd
I was a zoo and wildlife park employee for years. Both the wildlife park and zoo claimed to be operating for the benefit of the animals and for conservation purposes. This claim was false. Neither one of them actually participated in any contributions whose bottom line is much more important than the condition of the animals.
Animals despise being captives in zoos. No matter how you “enhance” enclosures, they do not allow for freedom, a natural diet or adequate time for transparency with these institutions, and it's past time to eliminate zoos from our culture.
(42) Karen R. Sime
As a zoology professor, I agree with Emma Marris that zoo displays can be sad and cruel. But she underestimates the educational value of zoos.
The zoology program at my university attracts students for whom zoo visits were the crucial formative experience that led them to major in biological sciences. These are mostly students who had no opportunity as children to travel to wilderness areas, wildlife refuges or national parks. Although good TV shows can help stir children's interest in conservation, they cannot replace the excitement of a zoo visit as an intense, immersive and interactive experience.Surely there must be some middle ground that balances zoos' treatment of animals with their educational potential.
(43) Greg Newberry
Emma Marris's article is an insult and a disservice to the thousands of passionate who work tirelessly to improve the lives of animals and protect our planet. She uses outdated research and decades-old examples to undermine the noble mission of organization committed to connecting children to a world beyond their own.
Zoos are at the forefront of conservation and constantly evolving to improve how they care for animals and protect each species in its natural habitat. Are there tragedies? Of course. But they are the exception not the norm that Ms. Marris implies. A distressed animal in a zoo will get as good or better treatment than most of us at our local hospital.
(44) Dean Gallea
As a fellow environmentalist animal-protection advocate and longtime vegetarian. I could properly be in the same camp as Emma Marris on the issue of zoos. But I believe that well-run zoos and the heroic animals that suffer their captivity so serve a higher purpose. Were it not for opportunities to observe these beautiful wild creatures close to home many more people would be driven by their fascination to travel to wild areas to seek out disturb and even hunt them down.
Zoos are in that sense similar to natural history and archeology museums serving to satisfy our need for contact with these living creatures while leaving the vast majority undisturbed in their natural environments.
(45) John Fraser
Emma Marris selectively describes and misrepresents the findings of our research. Our studies focused on the impact of zoo experiences on how people think about themselves and nature and the data points extracted from our studies.
Zoos are tools for thinking. Our research provides strong support for the value of zoos in connecting people with animals and with nature. Zoos provide a critical voice for conservation and environmental protection. They afford an opportunity for people from all backgrounds to encounter a range of animals from drone bees to springbok or salmon to better understand the natural world we live in.
【背景资料】某公司中标新建水厂大清水池工程现浇清水池内部规格120×30×4.8m(长×宽×高),清水池底板 厚 0.8m,顶板厚 0.6m,侧墙 0.4m。水池侧墙采用滑模施工,顶板采用满堂支架法。水池采用自防水混凝土,标号 C50(2.5吨/m³)。
地质资料显示,地下水位位于地表以下 15m。依据开挖方案,在清水池基坑的北侧采用土钉墙支护措施,土钉墙边坡整体长度 120m,断面图如下所示。
面板混凝土喷射采用分两层进行,为保证两层混凝土衔接紧密,项目部要求在下层混凝土终凝前喷射 完上层混凝土,且要求喷射混凝土的顺序自上而下进行。

【背景资料】某机电公司承接一地铁机电工程(4站4区间),该工程位于市中心繁华区,施工周期共16个月,工程范围包括通风与空调、给排水及消防水、动力照明、环境与设备监控系统等。
工程各站设置3台制冷机组,单台机组重量为5.St,位于地下站台层。各站两端的新风及排风竖井共安装6台大型风机。空调冷冻,冷却水管采用镀锌铜管焊接法兰连接,法兰焊接处内外焊口做防腐处理。其中某站的3台冷却塔按设计要求设置在地铁入口外的建筑区围挡内,冷却塔并排安装且与围挡建筑物距离为2.Om。
机电工程工期紧,作业区域分散,项目部编制了施工组织设计,对工程进度,质量和安全管理进行重点控制。在安全管理方面,项目部根据现场作业特点,对重点风险作业进行分析识别,制定了相应的安全管理措施和应急预案。
在车站出入口未完成结构施工时,全部机电设备,材料均需进行吊装作业,其中制冷机组和大型风机的吊装运输分包给专业施工队伍。分包单位编制了吊装运输专项方案后即组织实施,被监理工程师制止,后经审批,才组织实施。
在公共区及设备区走廊上方的管线密集区,采用“管线综合布置”的机电安装新技术,由成品镀锌型钢和专用配件组成的综合支吊架系统。机电管线深化设计后,解决了以下问题:避免了设计图纸中一根600×400mm风管与400×200mm电缆桥架安装位置的碰撞;确定了各机电管线安装位置;断面尺寸最大的风管最高,电缆桥架居中,水管最低;确定管线间的位置和标高,满足施工及维修操作面的要求。机电公司根据优化方案组织施工,按合同要求一次完成。
【背景资料】某煤矿新建一副立井井筒,设计净直径8.6m,深度900m。该井筒地质资料表明,冲积层及风化带厚度400m,由砂质粘土、砂层和卵石层组成,含水率低且流动性小,水压不大于0.19MPa,稳定性较差;基岩段以泥岩、砂岩及泥质砂岩为主,为弱稳定到中等稳定岩层。井壁结构表土段采用钢筋混凝土,基岩段采用普通混凝土,混凝土强度等级C35。
某施工单位承建该井筒施工项目,根据地质资料、初步设计、机械化配套方案等编制了井筒施工组织设计。施工组织设计中,表土层及基岩段均采用冻结法施工,基岩段采用钻眼爆破法,模板选用高度3.6m的金属整体模板,混凝土采用输料管下放。
施工过程中,发生了下列事件:
事件1:表土段施工结束,监理工程师组织了工程验收。施工单位提供的全部验收资料中,表土层掘进分项工序验收记录表共73份,抽查10份。其中,主控项目井筒掘进半径部分验收记录表上测点数为5~7个。验收时,监理工程师现场选择3个检查点检测井筒净半径,检查点的位置距井口20m、55m、80m。
事件2:该井筒在基岩段共穿过两个含水层,厚度分别为15m和30m,相隔30m,两个含水层最大涌水量均为40m³/h。施工单位在没有采取有效措施的情况下进行了混凝土浇筑。脱模后发现井壁质量蜂窝麻面严重,井筒一侧半径偏差达到-20mm。
事件3:为保证施工安全和井筒施工质量,施工单位对井筒基岩段较厚的含水层与断层破碎带选择了工作面预注浆治水方案,保证了井筒的顺利施工。
【背景资料】某矿井一倾斜巷道采用下山法进行掘进,施工单位编制了施工作业规程,其中施工的主要安全技术措施及要求的条款为:
(1)工作面采用电动凿岩机钻眼,钻眼必须湿式作业;
(2)工作面放炮工作由专职放炮工担任,考虑到围岩涌水量较少,可采用非防水炸药进行爆破;
(3)工作面采用抽出式通风,以迅速排除炮烟及粉尘,风筒选用直径600mm的胶皮风筒;
(4)进行装岩前,必须进行喷雾洒水,定期清理岩壁;
(5)施工中必须设置防跑车装置,主要考虑在工作面上方20~40m处设置可移动式挡车器。
(6)巷道内每隔一定距离,在侧壁上开设排水硐室,安装排水设备,排除工作面的积水。
某安装公司承接一公共建筑(地上30层和地下2层)的电梯安装工程,工程有32层32站曳引式电梯8台,工期为90天,开工时间为3月18日,其中6台客梯需智能群控,2台消防电梯需在4月30日交付使用,并通过消防验收,在工程后期作为施工电梯使用。电梯井道的脚手架工程、机房及层门预留孔的安全技术措施由建筑工程公司实施。
安装公司项目部进场后,将拟安装的电梯情况,书面告知了电梯安装工程所在地的特种设备安全监督管理部门。按合同要求编制了电梯施工方案和电梯施工进度计划(见下表)等,电梯安装采用流水搭接平行施工,作业人员配置有钳工、焊工、电工、起重工等。电梯安装前,项目部对机房和井道进行检测,设备基础位置、结构尺寸及外观质量均符合电梯安装要求;曳引电机、控制柜、轿厢、层门、导轨等电梯设备外观检查合格,并采用建筑塔吊及外墙施工电梯将设备搬运到位,使电梯安装工程按施工进度计划实施,交付业主。

下列不属于权力机关组成人员对行政的监督的是( )。
依法联名提出议案、质询案、罢免案
提出对各方面工作的建议、批评和意见
调查处理国家行政机关及其公务员和国家行政机关任命的其他人员违反行政纪律的行为
参加审议各项议案、报告和其他议题,发表意见
2014年1月4日,某铁矿早班22人入井作业,1月4日12时左右,井下水量增大。14时左右,正在井下巡查的技术负责人李某突然发现-80m平巷由南向北出现涌水且涌水量明显增大,遂立即告知带班矿长朱某,朱某立即通知作业人员升井,并报告井上值班矿长杨某。18名井下作业人员陆续升井,-120m水平作业点4名工人未能及时撤离被困井下。事故发生后,市政府立即启动应急救援预案,省、市、县领导亲临现场指导抢险救援工作。经过5天救援,9日10时55分,在南一下山-93m平巷入口下部发现4名被困人员,升井后经医疗机构确诊,4人均已死亡。
根据以上场景,回答下列问题(共22分):