某承包商于某年承包某外资工程的施工,与业主签订的承包合同约定:工程合同价2000万元;若遇物价变动,工程价款采用调值公式动态结算。该工程的人工费占工程价款的35%,水泥占23%,钢材占12%,石料占8%,砂料占7%,不调值费用占15%;开工前业主向承包商支付合同价20%的工程预付款,当工程进度款达到合同价的60%时,开始从超过部分的工程结算款中按60%抵扣工程预付款,竣工前全部扣清;工程进度款逐月结算,每月月中预支半月工程款。
人民调解是解决民事纠纷的必经途径
人民调解协议具有合同效力
任何一方当事人都可以向法院申请确认人民调解协议
一方当事人不履行经法院确认的人民调解协议的,另一方当事人可以向法院提起诉讼
51. You are supposed to write for the Postgraduates’ Association a notice to recruit volunteers for an international conference on globalization. The notice should include the basic qualifications of applicants and other information which you think is relevant.
You should write about 100 words on ANSWER SHEET
Do not sign your own name at the end of the notice. Use "postgraduates’ Association" instead. (10 points)
The growth of the use of English as the world’s primary language for international communication has obviously been continuing for several decades. (46) But even as the number of English speakers expands further there are signs that the global predominance of the language may fade within the foreseeable future.
Complex international, economic, technological and cultural changes could start to diminish the leading position of English as the language of the world market, and UK interests which enjoy advantage from the breadth of English usage would consequently face new pressures. Those realistic possibilities are highlighted in the study presented by David Graddol. (47) His analysis should therefore end any self-contentedness among those who may believe that the global position of English is so stable that the young generations of the United Kingdom do not need additional language capabilities.
David Graddol concludes that monoglot English graduates face a bleak economic future as qualified multilingual youngsters from other countries are proving to have a competitive advantage over their British counterparts in global companies and organizations. Alongside that, (48) many countries are introducing English into the primary-school curriculum but British schoolchildren and students do not appear to be gaining greater encouragement to achieve fluency in other languages.
If left to themselves, such trends will diminish the relative strength of the English language in international education markets as the demand for educational resources in languages, such as Spanish, Arabic or Mandarin grows and international business process outsourcing in other languages such as Japanese, French and German, spreads.
(49) The changes identified by David Graddol all present clear and major challenges to the UK’s providers of English language teaching to people of other countries and to broader education business sectors. The English language teaching sector directly earns nearly £1.3 billion for the UK in invisible exports and our other education related exports earn up to £10 billion a year more. As the international education market expands, the recent slowdown in the numbers of international students studying in the main English-speaking countries is likely to continue, especially if there are no effective strategic policies to prevent such slippage.
The anticipation of possible shifts in demand provided by this study is significant: (50) It gives a basis for all organizations which seek to promote the learning and use of English, a basis for planning to meet the possibilities of what could be a very different operating environment. That is a necessary and practical approach. In this as in much else, those who wish to influence the future must prepare for it.
【背景资料】
某中型水闸工程施工招标文件按《水利水电工程标准施工招标文件》(2009年版)编制。已标价工程量清单由分类分项工程量清单、措施项目清单、其他项目清单、零星工作项目清单组成。其中闸底板C20混凝土是工程量清单的一个子目(单位:100m³)。其中混凝土的配料、拌制、运输和浇筑过程中的损耗,由发包人按《工程量清单》相应项目有效工程量的每立方米工程单价支付。
事件1:A单位在投标截止时间前提交了投标文件。评标过程中,A单位发现工程量清单有算术性错误,遂以投标文件澄清方式提出修改,招标代理机构认为不妥。
事件2:招标人收到评标报告后对评标结果进行公示,A单位对评标结果提出异议。
事件3:经过评标,B单位中标。工程实施过程中,B单位认为闸底板C20混凝土强度偏低,建议将C20变更为C25。经协商后,监理人将闸底板混凝土自C20变更为C25。B单位按照变更估计原则,以现行材料价格为基础提交了新单价,监理人认为应按投标文件所附材料预算价格为计算基础提交新单价。
本工程在实施过程中,涉及工程变更的双方往来函件包括(不限于):
①变更意向书,
②书面变更建议,
③变更指示,
④变更报价书,
⑤撤销变更意向书,
⑥难以实施变更的原因和依据,
⑦变更实施方案等。
【背景资料】
某建设单位投资兴建住宅楼,建筑面积12000m²,钢筋混凝土框架结构,地下1层,地上7层,土方开挖范围内有局部滞水层。经公开招投标,某施工总承包单位中标。双方根据《建设工程施工合同(示范文本)》GF-2013-0201签订施工承包合同。合同工期为10个月,质量目标为合格。
在合同履约过程中,发生了下列事件:
事件一:施工单位对中标的工程造价进行了分析,费用构成情况是:人工费390万元,材料费2100万元,机械费210万元,管理费150万元,措施项目费160万元,安全文明施工费45万元,暂列金额55万元,利润120万元,规费90万元,税金费率为3. 41%。
事件二:施工单位进场后,及时按照安全管理要求在施工现场设置了相应的安全警示牌。
事件三:由于工程地质条件复杂,距基坑边5m处为居民住宅区,因此施工单位在土方开挖过程中,安排专人随时观测周围的环境变化。
事件四:施工单位按照成本管理工作要求,有条不紊的开展成本计划、成本控制、成本核算等一系列管理工作。
【问题】
某安装公司承接一 35kV 电力架空线路工程,线路长度 23km,跨越公路、河流、铁路,沿线海拔 1000~2000m,属于覆冰区,工程合同价为 3000 万元。安装公司对工程人工费、材料费、机械费等费用进行测算,给项目部下达的目标成本为 2760 万元。
项目部根据工程实际情况,优化施工方案,严格控制质量,按项目成本的分类编制了计划成本,计划成本为 2540 万元,并制订了突发事件的应急预案;施工过程中加大了成本控制力度,完工后,实际成本为 2500 万元,取得了较好的经济效益。
电杆及附件安装如图 1 所示;电杆、架线、接地等验收合格,工程施工质量优良,满足验收规范要求,工程资料档案符合要求。

【背景资料】
某机电安装公司承包了某市医院的机电安装工程,内容包括:变配电所工程、建筑电气工程、通风与空调工程、给水排水工程和锅炉安装工程等。其中变配电所应提前受电为其他建筑设备的试运转等提供条件。分承包合同约定:分承包工程应与总体工程同步完工,以便按期启动整个单位工程的竣工验收。在施工过程中发生了以下事件:
事件1:为使变配电所建设顺利开展,机电安装公司受业主委托进行用电申请,并向供电企业提供用电工程项目批准的文件及有关的用电资料。
事件2:在给水排水的隐蔽工程中,经监理工程师检查确定质量后进行覆盖。但发包方要求将一段已隐蔽的地下管线挖开进行重新验收,结果质量符合要求,机电安装公司对此要求5000元的经济赔偿。
电科集团是一家发展迅速的科技企业,为了增强职工的凝聚力和向心力,鼓励职工爱岗敬业,在企业长期工作,公司老板陈总计划制定年金计划,但是对于年金不是很了解,理财师就相关问题进行了解释。
根据以上材料回答下题。
某日8时40分,新疆某金属矿井下发生较大火灾和瓦斯爆炸事故,造成6人死亡、8人重伤、直接经济损失1490万元。该矿建设规模为9x104t/a,属于低瓦斯矿井,粉尘具有爆炸性,矿层自然发火,倾向性鉴定结果为自燃矿层。
事故发生在早上6点多,井口信号工看见风井主扇抽出黑烟,就打电话报告了矿长,10min后矿长到达井口,查看情况后通知井下撤人。7时,井下所有人员全部升井。7时30分,为探明井下情况,矿长等3人入井查看,查明火区位置后,8时整升井。8时30分,矿长带人入井灭火时发生爆炸,井下滞留8人未能升井。
事故调查后发现,金属矿安全管理决策层职责重叠,现场管理混乱。相关图纸不能反映井下实际情况,矿井没有绘制瓦斯巡回检查路线图,没有建立完善的防火墙管理档案。新入职的人员,未经入井培训,便直接下井作业。